
Home 14: wall checks before preparing new finishes
November 18, 2026
Home 12: STOP ONE checks at an external wall
November 18, 2026This private-home reference is presented under an anonymous number. The owner’s name and address are not published. It shows how a household installation can be documented through the records actually available, alongside the public-building references on this blog.
Installation took place on 22 April 2013; the inspection is dated 18 September 2014.
Readings and sampling conditions
| Sampling point | Initial record | Follow-up record |
|---|---|---|
| Left external wall | 5 gr/100 | 2.1 gr/100 |
| Utility room | 4.6 gr/100 | 1.3 gr/100 |
The figures reproduce the report. Heights and depths differ between visits, and one depth unit is inconsistent. The file documents changing readings rather than samples taken under strictly identical conditions.
What was observed on site
The report describes drying that still needs to continue and stresses ventilation and keeping the device in its original position.
From this reference to your own building
Start with the cause of the damp. Marks near the floor, salts and damaged finishes need to be considered together with the construction and the history of water entry. A leaking pipe, rainwater penetration and condensation require their own investigation. Send a plan and dated photographs, and describe the wall materials and the affected areas. These details help relate a device’s stated coverage to its intended position.
How do I use this report when choosing a device?
Use it as a record of this building and these inspections. Keep the original units and sampling conditions with the figures. A renovation photograph shows the appearance of a surface; it does not measure its water content. Do not infer an overall reduction from samples whose mass, depth or height changed.
Which Humidistop range should I compare?
ATE devices are electromagnetic and use mains electricity. ATG devices are geomagnetic and operate without a mains connection. Check the exact specification and installation instructions for the chosen reference. The model used on a historical site and a product currently offered for sale must remain clearly identified. The result observed in one building does not guarantee the result in another.
Can I repaint immediately after installation?
Plan the finishing work from the actual condition of the wall, suitable materials and any salts present. Allow the drying to be followed over time and address other water sources. A calendar date alone does not establish that a substrate is ready for a new coating.
Read other documented Humidistop references
Source: anonymised Humidistop site report supplied for this case. The wording of the conclusions is attributed to the report; the readings are kept with their sampling conditions.




