
Home 03: carbide readings before refinishing the walls
November 18, 2026
Home 01: two walls monitored before renovation
November 18, 2026This private-home reference is presented under an anonymous number. The owner’s name and address are not published. It shows how a household installation can be documented through the records actually available, alongside the public-building references on this blog.
The comparison covers 2016–2018; the inspection took place on 22 October 2018.
Readings and sampling conditions
| Sampling point | Initial record | Follow-up record |
|---|---|---|
| North internal wall | 7.2 | 3.6 |
| East external wall | 5.8 | 2.7 |
The figures are transcribed from the lines headed “water weight per 20 g”. Both samples are recorded at 15 cm deep, at heights of 50 cm on the north side and 40 cm on the east side. An initial date in one line differs from the installation date on the cover.
What was observed on site
The report concerns a GEO 30 and describes drying still in progress. It also identifies a bathroom leak and lateral water penetration requiring separate attention.
From this reference to your own building
Start with the cause of the damp. Marks near the floor, salts and damaged finishes need to be considered together with the construction and the history of water entry. A leaking pipe, rainwater penetration and condensation require their own investigation. Send a plan and dated photographs, and describe the wall materials and the affected areas. These details help relate a device’s stated coverage to its intended position.
How do I use this report when choosing a device?
Use it as a record of this building and these inspections. Keep the original units and sampling conditions with the figures. A renovation photograph shows the appearance of a surface; it does not measure its water content. Do not infer an overall reduction from samples whose mass, depth or height changed.
Which Humidistop range should I compare?
ATE devices are electromagnetic and use mains electricity. ATG devices are geomagnetic and operate without a mains connection. Check the exact specification and installation instructions for the chosen reference. The model used on a historical site and a product currently offered for sale must remain clearly identified. The result observed in one building does not guarantee the result in another.
Can I repaint immediately after installation?
Plan the finishing work from the actual condition of the wall, suitable materials and any salts present. Allow the drying to be followed over time and address other water sources. A calendar date alone does not establish that a substrate is ready for a new coating.
Read other documented Humidistop references
Source: anonymised Humidistop site report supplied for this case. The wording of the conclusions is attributed to the report; the readings are kept with their sampling conditions.


