Anonymised home 11: photograph from the wall moisture inspection

Home 11: GEOSTOP monitoring in stone walls

November 18, 2026
Anonymised home 09: photograph from the wall moisture inspection

Home 09: two walls checked after a geomagnetic installation

November 18, 2026
Anonymised home 11: photograph from the wall moisture inspection

Home 11: GEOSTOP monitoring in stone walls

November 18, 2026
Anonymised home 09: photograph from the wall moisture inspection

Home 09: two walls checked after a geomagnetic installation

November 18, 2026
Show all

Home 10: an installation record and measurement photographs

This private-home reference is presented under an anonymous number. The owner’s name and address are not published. It shows how a household installation can be documented through the records actually available, alongside the public-building references on this blog.

The installation report is dated 11 March 2015; additional photographs were supplied for the file.

Readings and sampling conditions

Entries transcribed from the anonymised Humidistop report
Sampling point Initial record Follow-up record
External stone wall, at installation 3.7 gr/100 No final table supplied

The initial sample is recorded at 40 cm above the floor and 10 cm deep, in a table referring to 20 g. Additional photographs show electronic checks, weighing and a carbide test vessel. They do not establish a comparable final value without an associated follow-up sheet.

What was observed on site

This file illustrates the recording of an installation and measurement work. On its own, it does not support a quantified before-and-after result. The report recommends appropriate ventilation and drainage.

From this reference to your own building

Start with the cause of the damp. Marks near the floor, salts and damaged finishes need to be considered together with the construction and the history of water entry. A leaking pipe, rainwater penetration and condensation require their own investigation. Send a plan and dated photographs, and describe the wall materials and the affected areas. These details help relate a device’s stated coverage to its intended position.

How do I use this report when choosing a device?

Use it as a record of this building and these inspections. Keep the original units and sampling conditions with the figures. A renovation photograph shows the appearance of a surface; it does not measure its water content. Do not infer an overall reduction from samples whose mass, depth or height changed.

Which Humidistop range should I compare?

ATE devices are electromagnetic and use mains electricity. ATG devices are geomagnetic and operate without a mains connection. Check the exact specification and installation instructions for the chosen reference. The model used on a historical site and a product currently offered for sale must remain clearly identified. The result observed in one building does not guarantee the result in another.

Can I repaint immediately after installation?

Plan the finishing work from the actual condition of the wall, suitable materials and any salts present. Allow the drying to be followed over time and address other water sources. A calendar date alone does not establish that a substrate is ready for a new coating.

Read other documented Humidistop references

Source: anonymised Humidistop site report supplied for this case. The wording of the conclusions is attributed to the report; the readings are kept with their sampling conditions.

Humidistop – Wall drying devices for rising damp
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.