
Home 08: a geomagnetic check with drying still in progress
November 18, 2026
Home 06: carbide checks in an older brick-built house
November 18, 2026This private-home reference is presented under an anonymous number. The owner’s name and address are not published. It shows how a household installation can be documented through the records actually available, alongside the public-building references on this blog.
Installation took place on 18 April 2014; the follow-up is dated 16 October 2015.
Readings and sampling conditions
| Sampling point | Initial record | Follow-up record |
|---|---|---|
| Right entrance wall | 7.4 gr/100 | 1.3 gr/100 |
| Right external semi-buried wall | 9.5 gr/100 | 0.8 gr/100 |
The units reproduce the report. The first point remains at 25 cm high, but the second changes from 30 to 25 cm; the stated depth is 20 cm. The second sample therefore was not taken under strictly identical conditions.
What was observed on site
The report describes drying as complete while requesting separate work on lateral water penetration and improved ventilation.
From this reference to your own building
Start with the cause of the damp. Marks near the floor, salts and damaged finishes need to be considered together with the construction and the history of water entry. A leaking pipe, rainwater penetration and condensation require their own investigation. Send a plan and dated photographs, and describe the wall materials and the affected areas. These details help relate a device’s stated coverage to its intended position.
How do I use this report when choosing a device?
Use it as a record of this building and these inspections. Keep the original units and sampling conditions with the figures. A renovation photograph shows the appearance of a surface; it does not measure its water content. Do not infer an overall reduction from samples whose mass, depth or height changed.
Which Humidistop range should I compare?
ATE devices are electromagnetic and use mains electricity. ATG devices are geomagnetic and operate without a mains connection. Check the exact specification and installation instructions for the chosen reference. The model used on a historical site and a product currently offered for sale must remain clearly identified. The result observed in one building does not guarantee the result in another.
Can I repaint immediately after installation?
Plan the finishing work from the actual condition of the wall, suitable materials and any salts present. Allow the drying to be followed over time and address other water sources. A calendar date alone does not establish that a substrate is ready for a new coating.
Read other documented Humidistop references
Source: anonymised Humidistop site report supplied for this case. The wording of the conclusions is attributed to the report; the readings are kept with their sampling conditions.




