
Buzy church: an ATG installation with a 60-metre operating diameter
November 11, 2026
Bardos town hall: measurements before and after ATG treatment
November 11, 2026Photographs of Buzy town hall in France show the transformation of a public stone building before and after renovation. The installation report identifies the Humidistop intervention and distinguishes this site from the church and the senior citizens’ hall in the same village.
An installation recorded in May 2016
The geomagnetic ATG installation dates from 17 May 2016 and was positioned in the council chamber. The report specifies an operating diameter of 30 metres, equivalent to a radius of 15 metres.
What the photographs show
The two views show the same building from different angles. Changes are visible in the pointing, finishes and surrounding area. The dates of the photographs are not established in the file. They illustrate the renovation without attributing all its visual effects to the damp treatment.
No final numerical follow-up result is available for this town hall. A visual comparison cannot replace measurement of the water contained in the masonry.
Supporting the drying process
The installation report recommends good air circulation and work on the stone joints to help evaporation. This case therefore combines a documented ATG installation with a photographic record of renovation, while keeping architectural changes separate from moisture monitoring.



