
Guiche church: renovation photographs and an attested Humidistop intervention
November 11, 2026
Buzy church: an ATG installation with a 60-metre operating diameter
November 11, 2026Community buildings also need documented monitoring of their masonry. At the senior citizens’ hall in Buzy, France, an installation report and later inspection allow one sampling point to be followed over time.
A 30-metre electromagnetic installation
The intervention is dated 19 July 2016. The file describes an electromagnetic ST30 device, corresponding to the ATE LC30 designation supplied by Humidistop, with an operating diameter of 30 metres. The follow-up on 7 March 2018 concerns this hall, not the town hall or the church.
Readings in the inspection report
| Sampling point | At installation | At follow-up |
|---|---|---|
| Right external wall | 6.5 g/100 | 1.1 g/100 |
Analysis uses the calcium carbide method. Sampling height remains 30 cm, while depth changes from 15 to 20 cm. The decrease must be read in light of this difference in sampling conditions.
Monitoring and maintenance
The file also notes partially buried walls and gives recommendations on ventilation, drainage, gutters and external renders. The follow-up describes drying as ongoing and recommends keeping the installation in its position. The published result relates to this particular sampling point and is not extrapolated to the whole building.

