
A customer installs an ATE in a passageway in Saint-Joseph
November 18, 2026
Saint-Pierre art centre: an ATE installed during renovation
November 18, 2026At the Vue Belle dojo in Saint-Paul, this customer photo shows a wall-mounted ATE beside a doorway. A drill, spirit level and tape measure are visible nearby, showing preparation and fixing with the power supply plugged in below the device.
A guide to the names used in our references: STOP ONE corresponds to the ATE family of mains-powered electromagnetic polarity inverters. GEOSTOP corresponds to the ATG family of geomagnetic polarity inverters without an electrical connection. Specifications and installation instructions remain specific to each model.
Choose the position before drilling
Installation without a line of chemical injections still requires suitable wall fixings. Choose the exact model and coverage for the building, mark the affected walls on a plan and follow the instructions supplied with the device. Check the wall type, installation height and clearances from other equipment. For the ATE LC range, the documentation specifies a damp load-bearing wall and continuous mains power. A customer photo does not independently verify every clearance.
Quick installation and gradual wall drying are different stages
No timed record was supplied for this installation, so no precise installation duration is claimed. The photo documents the installed unit and wiring; it is neither a moisture measurement nor a before-and-after comparison. Identify the cause of the damp and deal separately with leaks, water ingress and condensation. Prepare finishing work according to the actual condition of the substrate and any salts.
Planning a similar installation?
Gather a floor plan and dated photographs of the affected walls. Humidistop can help you check the device reference, coverage and installation conditions. Keep the installation instructions with the equipment and follow the drying process over time.




